CAS OpenIR  > 中科院上海应用物理研究所2011-2019年
The status of the first infrared beamline at Shanghai Synchrotron Radiation Facility
Ji, T; Tong, YJ; Zhu, HC; Zhang, ZY; Peng, WW; Chen, M; Xiao, TQ; Xu, HJ
2015
Source PublicationNUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT
Volume788Pages:116—121
Subtype期刊文献
AbstractConstruction of the first infrared beamline BL01B1 at Shanghai Synchrotron Radiation Facility (SSRF) was completed at the end of 2013. The IR beamline collects both edge radiation (ER) and bending magnet radiation (BMR) from a port, providing a solid angle of 40 mrad and 20 mrad in the horizontal and vertical directions, respectively. The optical layout of the infrared beamline and the design of the extraction mirror are described in this paper. A calculation of the beam propagation has been used to optimize the parameters of the optical components. The photon flux and spatial resolution have been measured at the end station, and the experimental results are in good agreement with the theoretical calculation. (C) 2015 Elsevier B.V. All rights reserved.
KeywordMicrospectroscopy Surface Design Light
Indexed BySCI
Language英语
Document Type期刊论文
Identifierhttp://ir.sinap.ac.cn/handle/331007/24600
Collection中科院上海应用物理研究所2011-2019年
Recommended Citation
GB/T 7714
Ji, T,Tong, YJ,Zhu, HC,et al. The status of the first infrared beamline at Shanghai Synchrotron Radiation Facility[J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,2015,788:116—121.
APA Ji, T.,Tong, YJ.,Zhu, HC.,Zhang, ZY.,Peng, WW.,...&Xu, HJ.(2015).The status of the first infrared beamline at Shanghai Synchrotron Radiation Facility.NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT,788,116—121.
MLA Ji, T,et al."The status of the first infrared beamline at Shanghai Synchrotron Radiation Facility".NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT 788(2015):116—121.
Files in This Item: Download All
File Name/Size DocType Version Access License
The status of the fi(1416KB)期刊论文作者接受稿开放获取CC BY-NC-SAView Download
Related Services
Recommend this item
Bookmark
Usage statistics
Export to Endnote
Google Scholar
Similar articles in Google Scholar
[Ji, T]'s Articles
[Tong, YJ]'s Articles
[Zhu, HC]'s Articles
Baidu academic
Similar articles in Baidu academic
[Ji, T]'s Articles
[Tong, YJ]'s Articles
[Zhu, HC]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Ji, T]'s Articles
[Tong, YJ]'s Articles
[Zhu, HC]'s Articles
Terms of Use
No data!
Social Bookmark/Share
File name: The status of the first infrared beamline at Shanghai Synchrotron Radiation Facility.pdf
Format: Adobe PDF
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.